What Materials Do You Use?
Our standard materials include: Pressure Treated Lumber, 2x6 and 2x8 Framing, 5/4" Decking, Foam Filled Floats (AKA"polyfloats") for Flotation, Metal Flat Top Hinges, Hot Dipped Galvanized Hardware, Galvanized Welded Bars and Angles, Welded Square Tubing and Galvanized Truss Frames. Upgrades Such As Rot Proof Plastic Lumber, Framing and Decking are also available.
How To Maintain My Dock in the Winter?
For areas with harsh winters, removing and storing your dock is often the best way to protect it from the elements. Remove and store your dock, ramp and accessories including benches, tables, and ladders somewhere safe for the winter.
Depending on your location from us, we offer seasonal dock removals/winterization methods in the winter and re-installations/de-winterization measures in the spring which you can request us to quote. We also have the means to make customized winterization items for your dock if you are interested.
How Long Does the Delivery/Installation Process Take?
After placing your initial deposit on your new system, we start ordering your materials to build your dock. Lead times can be anywhere from 3-6 weeks, depending on how fast your materials can get in to our shop so we can start building. Another factor could include waiting on approval from your state/city on the dock design, which could take up to 3 months or more.